Client: | Stockton Port District | |
Location: | Twitchell Island, CA | |
Delivery Method: | Design - Bid - Build |
The project consists of construction a containment levee on Twitchell Island. The levee consists of approximately 28,000 cy and is intended to contain future dredge material. The work also including reworking existing ditches, installing culverts, and hydroseeding.