Dredging Highlight Archives - The Dutra Group https://www.dutragroup.com/portfolio-category/dredging-highlight/ The Dutra Group Website Mon, 04 Sep 2023 19:20:46 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.1 https://www.dutragroup.com/wp-content/uploads/2022/09/cropped-dutra-logo1-512x512-1-32x32.png Dredging Highlight Archives - The Dutra Group https://www.dutragroup.com/portfolio-category/dredging-highlight/ 32 32 Caminada Headland, Louisiana, Beach and Dune Restoration Increment II https://www.dutragroup.com/portfolio-item/caminada-headland-beach-and-dune-restoration-increment-ii-2/ https://www.dutragroup.com/portfolio-item/caminada-headland-beach-and-dune-restoration-increment-ii-2/#respond Thu, 01 Dec 2016 20:24:37 +0000 https://www.dutragroup.com/?post_type=portfolio-item&p=12305 Our hopper dredge Stuyvesant accomplished the dredging and pump-off in one continuous 24/7 operation.

The post Caminada Headland, Louisiana, Beach and Dune Restoration Increment II appeared first on The Dutra Group.

]]>

Project Description

Suuyvesant Dredging and Pump-Off in one continuous operation (24/7). The Headland Work Area extends from Latitude 29º 07′ 35″N, Longitude 90º 09′ 11″W to Latitude 29º 11′ 16″N, Longitude 90º 03′ 10″W.

The beach and dune fill sediments will be mined from a borrow area located on Ship Shoal within the Bureau of Ocean Energy Management (BOEM) Offshore Continental Shelf (OCS) Lease Blocks South Pelto 13 and 14, approximately 30 nautical miles (NM) southwesterly from the Work Area.

The borrow area is centered at Latitude 28º 54′ 47″N, Longitude 90º 37′ 12″W.

Environmental Restrictions and Monitoring required.

The post Caminada Headland, Louisiana, Beach and Dune Restoration Increment II appeared first on The Dutra Group.

]]>
https://www.dutragroup.com/portfolio-item/caminada-headland-beach-and-dune-restoration-increment-ii-2/feed/ 0
San Francisco Port Maintenance Dredging https://www.dutragroup.com/portfolio-item/san-francisco-port-maintenance-dredging/ https://www.dutragroup.com/portfolio-item/san-francisco-port-maintenance-dredging/#respond Thu, 01 Dec 2016 20:22:01 +0000 https://www.dutragroup.com/?post_type=portfolio-item&p=11912 On-call dredging at the Port of SF, including dredging, mobilization and demobilization, and hydrographic surveying.

The post San Francisco Port Maintenance Dredging appeared first on The Dutra Group.

]]>

Project Description

Project consists generally of on-call dredging at the Port of San Francisco, including mobilization and demobilization, hydrographic surveying, dredging, dredge material transportation for in-Bay disposal, ocean disposal to beneficial reuse sites, and crane lifting services, all as set forth in the construction contract documents.

The post San Francisco Port Maintenance Dredging appeared first on The Dutra Group.

]]>
https://www.dutragroup.com/portfolio-item/san-francisco-port-maintenance-dredging/feed/ 0
Canaveral Harbor, Florida, 44-Foot Channel https://www.dutragroup.com/portfolio-item/canaveral-harbor-44-foot-channel-123-2/ https://www.dutragroup.com/portfolio-item/canaveral-harbor-44-foot-channel-123-2/#respond Mon, 01 Dec 2014 20:26:50 +0000 https://www.dutragroup.com/?post_type=portfolio-item&p=12307 We dredged approximately 3 million cubic yards of material to widen and deepen the main channel at Port Canaveral, Florida.

The post Canaveral Harbor, Florida, 44-Foot Channel appeared first on The Dutra Group.

]]>

Project Description

The Canaveral Port Authority has contracted Dutra Dredging to widen and deepen the main channel at Port Canaveral, Florida. The work consists of dredging approximately 3 million cubic yards of material with disposal in an offshore site.

Dutra recently mobilized the Derrick Barge Paula Lee and two split-hull dump scows, the 5000 cubic yard CK7 and 3000 cubic yard DS6 from their home base in San Rafael, California, to the job site via the Panama Canal. Work began in May 2014.

This contract marks a return to East Coast clamshell dredging for The Dutra Group after a period of focusing operations on the West Coast. Management and the project staff look forward to a successful 2015 completion.

The post Canaveral Harbor, Florida, 44-Foot Channel appeared first on The Dutra Group.

]]>
https://www.dutragroup.com/portfolio-item/canaveral-harbor-44-foot-channel-123-2/feed/ 0