Current Projects
Lower Sacramento River

Project: Sacramento River Bank Protection, Phase II
Lower Sacramento River Erosion Control
Owner: US Corps of Engineers
Project Value: $17,610,435
Project Duration: Jul 2006 ~ Nov 2006
Purpose: Riverbank Erosion Control and Levee Repair
Construction Activities:
- Produce, transport and place 212,000 tons of rip rap
rock on the water side of the levee
- Rebuild of the toe berms, including the anchoring of instream woody material
- Protection of existing trees and landscape
- Landscaping, seeding and irrigation
- Placement of fascine bundles, instream woody materials, agricultural soil, erosion control fabric